MNRE releases Solar PV plant performance data for May 2013

The Ministry of New and Renewable Energy(MNRE) has released the performance date for May 2013. The performance details, as always include the energy yeild as well as the CUF of the power plants commissioned under the JNNSM Phase 1 (batch 1 and 2) as well as the plants that were commissioned under the RPSSGP scheme. The details of operations of these power plants have been provided below.
JNNSM Phase 1 Batch 2

JNNSM Phase 1 Batch 1
Please click the image below to enlarge it.

RPSSGP
Please click the image below to enlarge it.

The performance data can be downloaded from the MNRE website – JNNSM Phase 1 Batch 1, Batch 2, RPSSGP
The details for the previous months can be accessed here.
_____________________________________________________________________________________________
Subscribe to RESolve Energy Consultants : Perspectives and Insights by Email
_____________________________________________________________________________________________

3 thoughts on “MNRE releases Solar PV plant performance data for May 2013”

  1. Is there a cumulative data of CUF for each plant since commissioning ?
    In my assessment, the yearly average of the best plant in the best location can only be around 25%. We can imagine the fate of rest of the plants. It is also interesting to note that, it is all brand new plants. After few years, the CUF is bound to be lower than this, thanks to the adverse climatic conditions we have.
    After few years, people will realise how bad was their decision to invest in Solar energy !

  2. Dear All,
    We have 1 MW Solar PV plant at Bhuj, we have recorded maximum generation of 6114 KWH Units with a CUF of 25.4 %.
    Please let me know if any of the plants who has achieved similar type in same capacity or more.
    Rgds,
    nikhil

Comments are closed.