India Solar – Electricity Generation Continued to Reduce In July 2013

The Ministry of New and Renewable Energy(MNRE) has released the performance data for July 2013. The performance details, as always include the energy yield as well as the CUF of the power plants commissioned under the JNNSM Phase 1 (batch 1 and 2) as well as the plants that were commissioned under the RPSSGP scheme. After touching a peak generation in May 2013, the generation has dropped in the last two months and this drop can be attributed mainly to the cloudy conditions and rains caused by the south-west monsoon prevalent across the country.
The details of operations of these power plants have been provided below.
JNNSM Phase 1 Batch 2

Please click the image to enlarge
JNNSM Phase 1 Batch 1

Please click the image to enlarge
RPSSGP

Please click the image to enlarge
The performance data can be downloaded from the MNRE website – JNNSM Phase 1 Batch 1, Batch 2, RPSSGP
The details for the previous months can be accessed here and here.
_____________________________________________________________________________________________
Subscribe to RESolve Energy Consultants : Perspectives and Insights by Email
_____________________________________________________________________________________________